Skip to main content

Customer Area

LageplanNeu e 800

Preparation Hall 3 Preparation Hall 2 Preparation Hall 1 Measurement Room 2 Measurement Room 1 Small Climatic Wind Tunnel (small CWT) Large Climatic Wind Tunnel (large CWT) Soak room Kälteanlage

 

Point and click into different areas.

Download


More detailed information:

pdfTechnical Data Climatic Wind Tunnel

For customers:


If you want to get an access card to the customer area assigned to your project some safety briefings need to be completed successfully. To save time this can be done already in advance by following this link:
online safety briefings (customer)
As an overview and reminder, this folder is available at the reception: pdfSafetyFirst Folder

For suppliers:


For independent movement in the facility, safety training must be successfully completed in advance. This can be done online before arrival or directly on site: online safety briefings (supplier)
As an overview and reminder, this folder is available at the reception:pdfSafetyFirst Folder